Bottled Water Filling Production Line

Bottled Water Filling Production Line

Bottled water filling production line
2000BPH @ 500ML 

Traits of Bottled h2o filling generation line

1. The h2o bottling equipment is largely utilised in the h2o filling operations. Appropriate for non-carbonated consume filling equipment, The 3 features of bottle wash, fill and seal are composed in 1 physique of the equipment.
two. The whole method is computerized. The device is utilized in filling, mineral drinking water and purified h2o in bottles created of polyester and plastics.
3. The water bottling equipment can also be utilized in hot filling if it is put in with temperature managing unit. The deal with of the machine can be freely and conveniently turned to adjust the machine to fill different types of bottles.
four. The filling operation is quicker and far more steady simply because the micro pressure filling procedure of the new type is adopted.
five. The superior OMRON programmed controller (PLC) is adopted to handle the device to operate instantly while a transducer is employed in the bottle -coming into chains to modify speeds and coordinated with the transducer of the main equipment to make the operations of transferring bottle CZPT steadily and reliably.
6. It is practical to run with increased automation since each and every part of the machine is inspected to operate with photo electric power, On the bases, the filling components of the device can be changed into filling strategies of reduced vacuum. The filling classification of decrease vacuum (Z sort equipment) is applicable in glass bottles, filling alcoholic beverages, soy and such like supplies. The aluminum theft evidence cap and plastic cap can be adopted.

CZPT Parameters
 

Design CGF8-eight-3 CGF16-12-6 CGF18-18-6 CGF24-24-8 CGF32-32-ten CGF40-forty-ten CGF50-fifty-twelve
Rinsing CZPT No 8 sixteen eighteen 24 32 forty 50
Filling CZPT No eight 12 eighteen 24 32 40 fifty
Capping CZPT No three 6 six 8 ten twelve/ten twelve/10
RatedCapacity
(500ml)
2000BPH 4000BPH 7000-8000BPH ten thousand-12000BPH 12000-15000BPH 15000-18000BPH 20000-22000BPH
All round Size 1900*14
twenty*2000mm
2200*16
00*2300mm
2450*19
00*2300mm
2750*21
80*2400mm
4000*23
00*2300mm
4550*26
50*2300mm
5450*32
10*2300mm
Excess weight 1.5T two.2T 3.0T four.0T eight.0T 12.0T twenty.0T
Electricity(KW) 3.0kw three.5kw four.0kw four.8kw seven.6kw 8.3Kw nine.6Kw
Rated Voltage 380V 380V 380V 380V 380V 380V 380V

Features of Bottled drinking water filling creation line

Washer Station:
All 304 stainless metal rinser heads, h2o spray fashion inject design, much more preserve h2o consumption & more thoroughly clean
304 Stainless steel Gripper with plastic pad, ensure nominal bottle crash for the duration of washing
304 stainless steel washing pumps

Filler Station: 
The filling station employing all steel (not plastic) 304 stainless steel contact components presents regular accurate, high precision filling nozzle collectively with vacuum pump regurgitant system, to make sure the higher filling precision, ensure very same filling degree
Filling temperature is adjustable
Centre 304L stainless steel filling nozzle employed which are developed for greatest flow charge and bare minimum bottle distortion during filling.
All 304 stainless steel speak to elements & liquid tank, good polish, no death corner, easy to cleanse

Capper Station: 
Area & capping technique, electromagnetic capping heads, with load discharge perform, make confident least bottle crash in the course of capping
All 304stainless steel construction
No bottle no capping
Computerized quit when deficiency of caps

CZPT Support

Sample Service 
one.We can send out you the video of the managing equipment.
two.You are welcome to come to pay a visit to our organization,and see the device operating in our manufacturing unit,we can select you up from the station near our town.
3.If we get the authorization of the client who has brought the equipment from us ,we can explain to you their speak to imformation,you can go to vist their manufacturing unit.

CZPTized Service 
one.We can design the equipment according your requirements(materil,electrical power,filling type,the types of the bottles,and so on),at the exact same time we will give you our specialist suggestion,as you know,we have been in this market for many a long time.
2. We can provide some skilled recommendation when you start this venture, this sort of as attract the factory layout for you,assess the source h2o report.

Right after-Income Services
one.We will offer the invoice of load on time to make sure you can get the equipment speedily.
2.When you finish the Preparing situations ,our engineer will go to your manufacturing unit to set up the device ,and give you the working handbook ,and prepare your personnel until they can run the machine effectively.
three.We ask suggestions from our client and offer help when the manufacturing line have been employed for some time! 
four.We offer one particular year guarantee with spare parts free of charge.

CZPT Workshop

We Warmly Welcome CZPTers All In excess of The Globe To Our Firm.If You Have Interests In Our Products,You should Agreement With Us FREELY!
 
HangCZPT CZPT CZPT CO.,LTD

Bottled Water Filling Production Line

Tags